City building permits · May 2026
Groton Long Point borough Building Permits
Monthly residential building permits for Groton Long Point borough, Connecticut — 0 units in May 2026, 1 over the last 12 months.
0
Units (latest month)
0
Single-family units
0
Multifamily (5+) units
$0
Reported value
Trailing 12 months: 1 units permitted.
| Structure type | Units | Share |
|---|---|---|
| Single-family (1-unit) | 0 | — |
| 2-unit structures | 0 | — |
| 3–4 unit structures | 0 | — |
| Multifamily (5+ units) | 0 | — |
| All units | 0 | 100% |
Groton Long Point borough building permits — FAQ
How many building permits were issued in Groton Long Point borough, Connecticut?+
0 new residential units were authorized in Groton Long Point borough in May 2026, and 1 over the trailing 12 months, per the Census Building Permits Survey.
What types of housing is Groton Long Point borough permitting?+
In May 2026, 0 single-family and 0 units in 5+ unit buildings were permitted — 0.0% of the total was multifamily.
Why might Groton Long Point borough's numbers be zero some months?+
Permit activity is lumpy at the city level, and small jurisdictions may report to the Census with a lag. Zero in a month means no permits were reported, not necessarily no construction interest.