Building permits · Jul 2026
U.S. building permits
Residential building permits from the U.S. Census Bureau’s monthly Building Permits Survey — 1,413,649 housing units authorized nationwide in the 12 months through Jul 2026, with the latest month up 6.1% against a year earlier. Broken out for every state, 922 metro areas, 3,038 counties and 12,900 permit-issuing cities and towns.
A permit is an authorization, not a housing start. Some authorized units are never built, and recent months are revised upward as late reports arrive. Use permits as the leading indicator of homebuilding they are, not as a count of construction underway.
| Structure type | Units | Share |
|---|---|---|
| Single-family (1-unit) | 80,611 | 62.6% |
| 2-unit structures | 3,288 | 2.6% |
| 3–4 unit structures | 1,733 | 1.3% |
| Multifamily (5+ units) | 43,236 | 33.6% |
| All units | 128,868 | 100% |
Compare this area with the rest of the country: ranked leaderboards for permit volume, permits per capita, year-over-year growth, and multifamily share.
Building permits by state
Housing units authorized in the 12 months through Jul 2026.
Top metro areas
By units permitted in the last 12 months.
- 1.Dallas-Fort Worth-Arlington TX61,275
- 2.Houston-Pasadena-The Woodlands TX59,214
- 3.New York-Newark-Jersey City NY-NJ57,375
- 4.Phoenix-Mesa-Chandler AZ35,159
- 5.Los Angeles-Long Beach-Anaheim CA34,696
- 6.Atlanta-Sandy Springs-Roswell GA33,511
- 7.Austin-Round Rock-San Marcos TX23,056
- 8.Tampa-St. Petersburg-Clearwater FL22,392
- 9.Washington-Arlington-Alexandria DC-VA-MD-WV21,779
- 10.Orlando-Kissimmee-Sanford FL21,166
- 11.Seattle-Tacoma-Bellevue WA20,712
- 12.Charlotte-Concord-Gastonia NC-SC19,485
- 13.Miami-Fort Lauderdale-West Palm Beach FL18,973
- 14.Raleigh-Cary NC18,703
- 15.Nashville-Davidson--Murfreesboro--Franklin TN16,883
- 16.North Port-Bradenton-Sarasota FL16,522
- 17.Denver-Aurora-Centennial CO16,055
- 18.Chicago-Naperville-Elgin IL-IN14,801
- 19.Minneapolis-St. Paul-Bloomington MN-WI14,757
- 20.Philadelphia-Camden-Wilmington PA-NJ-DE-MD14,154
Top counties
By units permitted in the last 12 months.
- 1.Los Angeles County28,583
- 2.Harris County28,331
- 3.Maricopa County27,595
- 4.Collin County16,561
- 5.Tarrant County15,480
- 6.Wake County14,808
- 7.Travis County11,766
- 8.Montgomery County11,744
- 9.Fort Bend County11,420
- 10.King County11,349
- 11.Manatee County11,093
- 12.Lee County11,055
- 13.Clark County11,004
- 14.Miami-Dade County10,909
- 15.Dallas County10,803
- 16.San Diego County10,414
- 17.Fulton County9,652
- 18.Denton County9,330
- 19.Orange County8,979
- 20.Kings County8,821
Rankings & leaderboards
Where housing is actually being authorized — 7 boards ranking metro areas and counties by volume, permits per capita, year-over-year change, and multifamily share.
Related housing data
Building permit terms
What the survey counts, and what it does not.
U.S. building permits — FAQ
How many building permits were issued in the U.S. last year?+
1,413,649 new privately owned residential housing units were authorized by building permits in the 12 months through Jul 2026, and 128,868 in Jul 2026 alone, per the U.S. Census Bureau Building Permits Survey.
What share of new U.S. housing is multifamily?+
37.4% of units authorized in Jul 2026 were in structures with 2 or more units; 62.6% were single-family. Of the total, 43,236 units were in buildings with 5 or more units.
Is a building permit the same as a housing start?+
No. A permit authorizes construction; a start is ground actually broken. Permits are published earlier and are the leading indicator of the two, but not every authorized unit is built, and the lag between authorization and start varies by market and structure type.
Where does this building permit data come from?+
The U.S. Census Bureau's Building Permits Survey, a monthly census of permit-issuing jurisdictions. It is a public-domain federal statistical product, free to reuse with attribution. Figures for recent months are revised as late reports arrive, and the county, metro and place detail lands about six weeks after the reference month — later than the national release.
Why does a city or county show zero permits in some months?+
Permit activity is genuinely lumpy below the state level, and a jurisdiction that did not report in a given month contributes nothing for that month. A zero means nothing was reported, which is not the same as no construction interest.
Get the monthly permit release
We'll email you when new Census Building Permits Survey data is published — the national, metro and county figures behind these rankings.
Roughly monthly, following the Census release schedule — national figures land about three weeks after the reference month, county and place detail about six. You'll get a welcome note. Unsubscribe anytime.